Evo malo detalja:
Station:
6m 6M8GJ
2m 4 x 9el horizontal and 4 x 6el vertikal design I3DLI
70cm 2 x 28 el. m2
23, 13, 9, 6 and 3cm 1.5m dish 1x2mm mesh, automatic az and el control
1296: 100W at feed, circular, preamp at horn
23xx: 80W at feed, circular, preamp at horn
3400: 80W at feed, circular, preamp at horn
5760: 80W at feed, circular, preamp at horn
10xxx: 50W at feed, v-pol, preamp at horn
We plan to be QRV from 1296 and up as follows:
14. October MR to MS 1296
15. October MR to MS 23xx (we can TRX on all sub-bands, so no cross-band
needed, depending of course on the QRM situation)
16. October MR to MS 3400 (VK sub-band should be OK)
17. October MR to MS 5760
18. October MR to MS 10xxx (we can TRX on 368 and 450, no cross-band
needed)
19./20./21. October we will be QRV on the bands where there is the most
need, this will be decided during the operation.